Saturday, April 18, 2009

Why Does My Computed Keep Lag

SISSA and the University of raised floors - INTEC COMPANY IN THE WORLD LEADER IN BUSINESS


THE BUBBLE OF INGOT


The Lingotto complex (500,000 square meters) was built in the '20s to accommodate the Fiat.

Right now became the largest plant in Europe and a point of reference for the architecture industry worldwide.

In the 90s the Lingotto has become the laboratory of the future for Torino, thanks to a multi-purpose project for the conversion by Renzo Piano.

Among the elements that characterize today outside the bubble is suspended at an extraordinary meeting room one of the courtyards, to offset the airstrip for helicopters.

Inside was laid one of the raised floor Intec , line Floor: fireproof panel made of chipboard and laminate finish binobilitato.
Subscribe to the Social Network

floor-sopraelevati.ning.com

blog floor-sopraelevati.blogspot.com